Bathroom Renovation Day 1

J.B. from Wilson's Plumbing showed up today just as promised to start on La Patrona's new shower. I took some pictures when I was home for lunch and this evening. Click on the pictures below to see the gigantor version.

First, he dug out the concrete to position the new drain and repositioned the water supply pipes.





He also removed the drywall to run pipes later. We're going to have two shower heads in this shower - one of the rain shower heads another on a slide bar for the Horde to use to soak the rest of the room. We figure they might actually get clean while they're doing it.




After lunch he came back and laid a mortar bed that slopes toward the drain.







When he was done for the day, he cleaned everything up. It was almost as clean after he was done as it was before he got there. The work, as you can see, is top notch.

J.B. will be back tomorrow to run the pipes. So far Wilson's Plumbing gets a big thumbs up from me.